| FAC-001-0 |
Bulk Electric System (BES) Facility Connection Requirements |
| Generation |
Transmission |
End-User |
Joint Studies (R2.1.1) |
PHI Generation and Transmission Interconnection Process, pg 5 paragraph 1
|
PHI Generation and Transmission Interconnection Process, pg 5 paragraph 1
|
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Section 3, pg 4 paragraph 4
|
Notification (R2.1.2) |
PHI Generation and Transmission Interconnection Process, pg 5, paragraph 2 |
PHI Generation and Transmission Interconnection Process, pg 5, paragraph 2 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Section 3, pg 4, paragraph 4
|
Volts, MW, MVAR (R2.1.3) |
PHI Generation and Transmission Interconnection Process, pg 6, paragraph 3 |
PJM Manual 03–Transmission Operations, Section 3, Pg 33 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Page 5, Section 5 |
Breaker Duty & Surge Protection (R2.1.4) |
(Breaker Duty) ACE/DPL Substation Design Manual, Vol. I, Section 9, Primary Equipment
Loadability and Conductor Ampacity, pg 8
(Surge protection) ACE/DPL Substation Design Manual, Vol. I, Section 6, Primary
System Design, Pgs 7-9
PEPCO Substation Design Manual
|
(Breaker Duty) ACE/DPL Substation Design Manual, Vol. I, Section 9, Primary Equipment
Loadability and Conductor Ampacity, pg 8
(Surge protection) ACE/DPL Substation Design Manual, Vol. I, Section 6, Primary
System Design, Pgs 7-9
PEPCO Substation Design Manual
|
(Breaker Duty) ACE/DPL Substation Design Manual, Vol. I, Section 9, Primary Equipment
Loadability and Conductor Ampacity, pg 8
(Surge protection) ACE/DPL Substation Design Manual, Vol. I, Section 6, Primary
System Design, Pgs 7-9
PEPCO Substation Design Manual
|
System Protection (R2.1.5) |
Technical Considerations Covering Parallel Operations of Customer Owned Generation of One Megawatt or Greater, Section VI.6.D., Pg 9, Section VIIA, Pg 12; Section VIIID, Pg 15
Atlantic City Electric Interconnection Standards for generators
Delmarva Power Interconnection Standards for generators
Pepco Interconnection Standards for generators
|
PJM Manual 03–Transmission Operations, Section 1, Pg 15 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Sections 16-17, pgs. 17-18 |
Metering & Telecom (R2.1.6) |
Technical Considerations Covering Parallel Operations of Customer Owned Generation of One Megawatt or Greater, Section VIII, L Pg 20-21
Atlantic City Electric Interconnection Standards for generators
Delmarva Power Interconnection Standards for generators
Pepco Interconnection Standards for generators
|
PJM Manual 01–Control Center and Data Exchange Requirements, Section 5, Pg 31 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Section 19, pg 19 |
Grounding & Safety (R2.1.7) |
ACE/DPL Substation Design Manual, Vol. I, Section 30, Substation Grounding, Pgs 1-25 of 25
PEPCO Substation Design Manual
|
ACE/DPL Substation Design Manual, Vol. I, Section 30, Substation Grounding, Pgs 1-25 of 25
PEPCO Substation Design Manual
|
ACE/DPL Substation Design Manual, Vol. I, Section 30, Substation Grounding, Pgs 1-25 of 25
PEPCO Substation Design Manual
|
Insulation & Coordination (R2.1.8) |
ACE/DPL Substation Design Manual, Vol. I, Section 12, Surge Arrestors, Insulation Coordination and Lightning Protection, Pgs 8-10 of 33
PEPCO Substation Design Manual
|
ACE/DPL Substation Design Manual, Vol. I, Section 12, Surge Arrestors, Insulation Coordination and Lightning Protection, Pgs 8-10 of 33
PEPCO Substation Design Manual
|
ACE/DPL Substation Design Manual, Vol. I, Section 12, Surge Arrestors, Insulation Coordination and Lightning Protection, Pgs 8-10 of 33
PEPCO Substation Design Manual
|
Voltage, Reactive Power, & PF Control (R2.1.9) |
Technical Considerations Covering Parallel Operations of Customer Owned Generation of One Megawatt or Greater, Section VIII, H-Pg 18 (Reactive Power)
Atlantic City Electric Interconnection Standards for generators
Delmarva Power Interconnection Standards for generators
Pepco Interconnection Standards for generators
PJM OATT–Section on Interconnection Service Agreement, Appendix 2, Article 4.7, Sheet 516.01B.07
|
PJM Manual 03–Transmission Operations, Section 3, Pg 33 |
ACE-New Jersey Electric Tariff for Electric Service Section II, Section 9.5, pg 23
DPL-Delaware Electric Tariff, Section XI – G, pg 26
DPL-Maryland Electric Tariff, Section XI – G, pg 26
PEPCO-Maryland Electric Tariff, Section 10, pg 38
PEPCO–District of Columbia Electric Tariff, Section 10, pg 32
|
Power Quality (R2.1.10) |
Technical Considerations Covering Parallel Operations of Customer Owned Generation of One Megawatt or Greater, Section VIII, G-Pg 18
Atlantic City Electric Interconnection Standards for generators
Delmarva Power Interconnection Standards for generators
Pepco Interconnection Standards for generators
|
PJM OATT – Section on Interconnection Service Agreement, Attachment O, Appendix 2, Article 4.9.2, Sheet 516.01B.10 |
ACE-New Jersey Electric Tariff for Electric Service Section II, Section 9.5, pg 23
DPL-Delaware Electric Tariff, Section XI – G pg 26
DPL-Maryland Electric Tariff, Section XI – G pg 26
PEPCO-Maryland Electric Tariff, Section 10, pg 38
PEPCO–District of Columbia Electric Tariff, Section 10, pg 32
|
Equipment Ratings (R2.1.11) |
ACE/DPL Substation Design Manual, Vol. I, Primary Equip. and Loadability Section 9.4, Pg 3 of 14
PEPCO Substation Design Manual
|
ACE/DPL Substation Design Manual, Vol. I, Section 12, Surge Arrestors, Insulation Coordination and Lightning Protection Section 9.4, Pg 3 of 14
PEPCO Substation Design Manual
|
ACE/DPL Substation Design Manual, Vol. I, Section 12, Surge Arrestors, Insulation Coordination and Lightning Protection Section 9.4, Pg 3 of 14
PEPCO Substation Design Manual
|
Synchronization (R2.1.12) |
PJM Manual 14D – Generator Operational Requirements, Section 7, Pg 55 |
PJM Manual 03 – Transmission Operations, Section 3, Pg 33 |
PJM Manual 03 – Transmission Operations, Section 3, Pg 33 |
Maintenance (R2.1.13) |
Technical Considerations Covering Parallel Operations of Customer Owned Generation of One Megawatt or Greater, Section IV.D., Pg 10; VI, I p9
Atlantic City Electric Interconnection Standards for generators
Delmarva Power Interconnection Standards for generators
Pepco Interconnection Standards for generators
|
PJM Manual 03 – Transmission Operations, Section 1, Pg 13 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Section 18, pg 19
|
Operation Issues (R2.1.14) |
PJM Manual 14D, Operational Requirements Section 7, Pg 44 |
PJM Manual 03 – Transmission Operations, Section 3, Pg 33 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, 10-13, Pgs 11-14 |
Inspection Requirements (R2.1.15) |
PJM OATT – Section on Interconnection Service Agreement, Attachment O, Appendix
2, Article 5.4, Sheet 516.01B.13 |
PJM OATT – Section on Interconnection Service Agreement, Attachment O, Appendix
2, Article 5.4, Sheet 516.01B.13 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Section
18, pg 19 |
Normal & Emergency Operating (R2.1.16) |
PJM OATT – Section on Interconnection Service Agreement, Attachment O, Appendix
2, Article 6, Sheet 516.01B.14 |
PJM Manual 01 – Control Center and Data Exchange Requirements, Section 3, Pg 20
& Section 4, Pg 28 |
Guidelines for Wholesale Interconnections to the Pepco Holdings Systems, Section